IndustryMunicipalitiesHow we workNewsDeutsche FassungCalculate potential
Solar carport by Green in Business, Halle (Westfalen)
Photovoltaics · Westphalia

Your site
is a power plant

Turnkey car park PV for industry and municipalities. As a general contractor from a single source, from steel construction through photovoltaics to the transformer station. Complemented by ground-mounted PV, rooftop PV and battery storage.

0%
from a single source
0 MWp
Experience in the founding team
0
parking spaces, ideal project size
Scroll
General contractor

Everything from a single source. All trades.

From feasibility study through planning, permitting and financing to steel construction, photovoltaics, transformer station, commissioning and operations. A single point of contact for all trades, product- and supplier-neutral and compliant with public procurement law.

Photovoltaic module in detail
02 · Turnkey

One partner. The whole journey.

A single point of contact. We coordinate trades, authorities and the grid operator.

01

Feasibility

Site check, yield and economic study. Go or no go.

02

Planning & permitting

Design, grid connection application, structural engineering, building permit, expert reports.

03

Financing & procurement

Business case, operating model, supplier-neutral procurement.

04

Construction as general contractor

Steel construction, photovoltaics, transformer station. All trades.

05

Commissioning & operations

Grid connection, commissioning, monitoring, maintenance.

03 · Financing

Buy it, or invest nothing at all.

You decide whether the system belongs to you or whether you simply draw on affordable solar power.

Model 1 Recommended

Buy and operate yourself

You invest, the system belongs to you, and the full yield stays in-house.

  • Highest return over the lifetime
  • Independence from rising electricity prices
  • Planned, built and handed over turnkey
  • Maintenance contract available on request
Model 2

No investment (lease or PPA)

We finance and operate, you draw on affordable solar power or lease out your site.

  • No capital outlay, no technical risk
  • Predictable electricity price below your grid tariff
  • Lease income for pure site providers
  • Worry-free including operations
04 · ESG & reporting obligations

Your car park becomes an ESG instrument.

CSRD and ESRS E1 require robust energy and GHG metrics. Own generation delivers them at the meter, physical, auditable, without certificates.

Scope 2

Measurably reduce from day one

Self-generated solar power reduces your Scope 2 emissions in reality, market- and location-based, not via guarantees of origin.

  • Takes effect in the GHG balance from the first year of operation
  • Avoided CO2 costs: valued at 90 €/t in the simulator
Scope 1

Electrify at the same time

Charging infrastructure directly under the carport: the electric fleet runs on its own solar power instead of diesel, and Scope 1 drops with every vehicle switch.

  • Charge during the day, when the system is producing
  • Independent of ETS2 prices on fossil fuels from 2027
Scope 3 of your customers

Stand out in supply chains

Your Scope 2 is your customers’ Scope 3. Suppliers with their own generation stand out in every CO2 survey, from OEM to retail.

  • Robust answers to supplier questionnaires
  • Contribution to SBTi targets, documented via monitoring
NRW PV obligation
35

From obligation to revenue source.

New and fundamentally renovated car parks with 35 or more parking spaces require a solar canopy in North Rhine-Westphalia. We take care of it turnkey, with a focus on larger car parks from 100, ideal from 250 parking spaces.

Calculate car park potential →
Steel structure of a new solar carport over a car park
Electricity price trend
+18 %

Electricity is getting more expensive. Your site makes you independent.

The industrial electricity price in Germany is rising: extrapolated on the basis of the BDEW electricity price analysis, this results in an increase of around 18 per cent by 2030, while the CO2 price in the EU Emissions Trading System climbs in parallel. On top of this, a trend is emerging that has begun in the US with artificial intelligence and the enormous energy demand of new data centres: Goldman Sachs expects significantly rising electricity prices there. If this demand spills over into Europe, prices here will come under considerable pressure as well. Those who generate their own electricity on their car park site make themselves independent of these price increases.

Sources: Industrial electricity price, extrapolation to 2030 on the basis of the BDEW electricity price analysis 2026; CO2 price EU-ETS / DEHSt; AI electricity demand as a US trend: Goldman Sachs Research, “The Macroeconomic Spillovers From AI Electricity Demand”, 11.02.2026.

Become independent: calculate potential →
Forecast to 2030: industrial electricity price +18 % and CO2 price +91 % (BDEW, DEHSt, EU-ETS)
Industrial electricity price rises from 17.0 to 20.0 ct per kWh, around +18 % by 2030CO2 price rises from 68 to 130 euros per tonne, around +91 % by 2030
Reference

Car park PV in Halle: around 2.4 MWp delivered.

For a confectionery manufacturer in Halle (Westfalen) we delivered a turnkey car park PV system, from the steel structure through the photovoltaics to the integration into the on-site grid. Around 2.4 MWp on the car park, all trades from a single source.

Discuss your project →
Completed car park PV system in Halle, Westphalia

What does your site deliver?

Enter parking spaces or square metres and immediately see output, yield and economics. The same calculation logic as in our project development.

Calculate potential now →