IndustryMunicipalitiesHow we workNewsDeutsche FassungCalculate potential
Solar carport in front of an industrial hall with lorry and car parking spaces
For industry and commerce

Your car park
reduces your electricity costs

Turnkey car park PV directly on site. High self-consumption, peak shaving, protected vehicles and a measurable CO2 balance. As a general contractor from a single source, from steel construction to photovoltaics to the transformer station.

0%
from a single source
0 kWh
Yield per kWp in Westphalia
from 0
parking spaces, ideally from 250
Scroll
01 · Cost-effectiveness

Six reasons for solar on your car park.

The unused car park becomes the cheapest energy source right on site.

Reduce electricity costs

High self-consumption directly at the plant. You replace expensive grid electricity with your own solar power at predictable generation costs, with an exceptionally low price per kWp and a payback period typically under ten years.

Peak shaving

With battery storage and peak shaving you smooth out power peaks and noticeably reduce your grid charges.

Protect vehicles

No ice scraping in winter, cool cars in summer, protection from hail and snow. A visible benefit for your employees.

CO2 and ESG

Measurable CO2 savings for your sustainability reporting, your supply chain and your rating.

Charge your EV fleet

Charge your vehicles directly under the carport. Ready for wallboxes and DC fast chargers, powered by your own electricity.

One point of contact

Steel construction, photovoltaics, transformer station and grid connection from a single source. You have one conversation, not five trades.

Speed and certainty

From our warehouse to your car park.

Own stock, binding fixed price, short construction time.

Own stock

We keep modules, inverters and battery storage in stock, so supply shortages do not hold us up.

Binding fixed price

We quote even large projects at a fixed price. Planning and budget certainty from the start.

6 to 12 weeks

From order to a completed, connected system typically six to twelve weeks.

On video

What your system looks like.

A short walkthrough of a completed car park PV system, with the key benefits at a glance.

NRW PV obligation
35

From obligation to revenue source.

New and fundamentally renovated car parks with 35 or more parking spaces require a solar canopy in North Rhine-Westphalia. We take care of it turnkey, with a focus on larger car parks from 100, ideally from 250 parking spaces.

Calculate car park potential →
Steel structure of a new solar carport over a car park
02 · Turnkey

One partner. The whole journey.

One point of contact. We coordinate trades, authorities and the grid operator.

01

Feasibility

Site check, yield and cost-effectiveness study. Go or no go.

02

Planning & permitting

Design, grid connection application, structural engineering, building permit, expert reports.

03

Financing & procurement

Business case, operating model, supplier-neutral procurement.

04

Construction as general contractor

Steel construction, photovoltaics, transformer station. All trades.

05

Commissioning & operations

Grid connection, commissioning, monitoring, maintenance.

03 · Financing

Buy it, or invest nothing at all.

You decide whether the system belongs to you or whether you simply draw on affordable solar power.

Model 1 Usually the first choice for industry

Buy and operate yourself

You invest, the system belongs to you, and the full yield and independence from electricity price increases stay in-house.

  • Highest return over the lifetime
  • Independence from rising electricity prices
  • Depreciation and possible subsidies available
  • Planned, built and handed over turnkey
Model 2

No investment (lease or PPA)

We finance and operate, you draw on affordable solar power or lease out your site.

  • No capital outlay, no technical risk
  • Predictable electricity price below your grid tariff
  • Off-balance-sheet, preserves your credit lines
  • Fully managed including operation
Site Simulator

What does your car park deliver?

Enter your parking spaces and immediately see output, annual yield and cost-effectiveness. The same calculation logic as in our project development.

Calculate now →
4.0 kWp
per parking space
~1,000 kWp
at 250 parking spaces
~950 MWh
solar power per year
Reference

Car park PV in Halle: approximately 2.4 MWp delivered.

For a confectionery manufacturer in Halle (Westfalen) we delivered a turnkey car park PV system, from the steel structure to the photovoltaics to the integration into the on-site grid. Approximately 2.4 MWp on the car park, all trades from a single source.

Discuss your project →
Completed car park PV system in Halle (Westfalen)
Site analysis

Free initial assessment for your site.

Send us the key details of your car park. We will get back to you with an initial assessment of output, yield and cost-effectiveness. No obligation and no cost.

  • Response from a dedicated contact person
  • Initial assessment at no cost and no obligation
  • Product- and supplier-neutral advice

By submitting, you agree to the processing of your details in order to handle your enquiry. There are no automated mailings; your enquiry is recorded and answered personally. Details in the privacy policy.

Thank you, your enquiry has been received.

A dedicated contact person will usually get back to you within one working day.